Thanks a lot Ashish.

 

what if you had PS and MM modules to work on too ?

 

Would you start PS and MM after you were done with FI and Logistics ? Or would you do the requirement gathering of all modules and then the realization and going live?

 

ASAP says that do the blueprint for all modules and then start the realization and set a deadline for the go live of the entire project

 

Also, assume that there is only one BI team responsible for all modules. In that case , that single team should do each module one after the other or follow ASAP and finish the blueprint for everything and then go to the next phase?